Onrus experienced perpetual uninterrupted power outages over the past long weekend of 16 December 2022.
This is apart from the ‘normal’ load shedding schedule stages 5 and 6.
After discussions with Eskom, part of the problem for not detecting the fault(s) sooner were caused by trees growing over, into and alongside overhead electrical cables.
This is especially dangerous, particularly during stormy weather conditions when branches can be knocked onto power lines.